CH-47F multiyear II: ~$4.9B for 34 new-build and 121 renewed helicopters (Boeing)
The Department of Defense awarded Boeing the second multiyear contract for the CH-47F cargo helicopter, valued at about $4.86 billion. The scope states 34 new-build and 121 renewed helicopters — nearly eight in ten of the aircraft covered are existing airframes being renewed, which says a great deal about how large aircraft fleets are actually sustained.
Contract key facts
- RecipientBoeing
- Contract value$4,864,238,446 (≈$4.86B)
- BranchDefense-wide
- Awarding agencyDepartment of Defense
- Awarding sub-agencyDefense Contract Management Agency
- Award typeDEFINITIVE CONTRACT
- Period of performance2013-06-10 〜 2022-09-30
- Contract ID (PIID)W58RGZ13C0002
Contract scope (original)
CH-47F CARGO HELICOPTER MULTIYEAR II. 34 NEW BUILD HELICOPTERS AND 121 RENEW HELICOPTERS.
Key points
- Boeing received the second multiyear contract for the CH-47F cargo helicopter, valued at about $4.86 billion ($4,864,238,446 cumulative).
- The scope states quantities: 34 new-build and 121 renewed helicopters — new builds are about 22 percent of the 155 covered.
- Renew is not repair; it means stripping down and replacing components to the current specification so the result matches the latest configuration.
- Period June 10, 2013 to September 30, 2022; the awarding component is the Defense Contract Management Agency.
- MULTIYEAR II marks the second multiyear for the type; this site also holds the H-60 multiyear VIII and IX contracts.
- Of 155 aircraft, 34 are new builds and 121 renewals of existing airframes — new builds are about 22 percent.
1The 34-and-121 split
What is unusual about this scope is that it states the quantities. Of the 155 aircraft covered, 34 are built new and the remaining 121 are renewed. New builds are about 22 percent. Large cargo helicopters have long-lived airframe structures, and what governs capability is inside — engines, avionics, flight controls.
Replacing the major internal elements of an existing aircraft is often the more sensible route than building the airframe again.
2"Renew" is not repair
Renew differs in purpose from maintenance that fixes a fault. It means stripping the aircraft down and replacing components with items of the current specification, so that the result is equivalent to the latest configuration. The finished aircraft is treated as the same model as a new build rather than as an old one.
Adding new builds and renewals together when counting aircraft in procurement data therefore misstates actual production capacity.
3Where multiyear II sits
MULTIYEAR II in the scope marks this as the second multiyear contract for the type. A multiyear commits several years of production at once, letting the contractor buy materials in bulk and hold unit cost down. This site also holds the eighth and ninth multiyear contracts for the H-60 Black Hawk, so the same procurement method can be seen recurring across aircraft types.
4Of 155 aircraft, 34 are new builds
What makes this description unusual is that the breakdown by aircraft is stated. Of the 155 covered, 34 are newly built and the remainder are renewals of existing airframes.
As a share, new builds come to about 22 percent. A large transport helicopter has a long structural life, and what governs its performance sits inside — engines, avionics, flight controls. Renewal differs in purpose from repair: the aircraft is stripped down and its components replaced with the current specification, leaving it equivalent to a new-build machine.
Counting aircraft in procurement data without separating new builds from renewals misreads what production capacity actually is.
Why it matters
New builds and renewals need different materials, different processes, and a different mix of subcontractors. Where renewal dominates, the weight shifts from airframe manufacturers toward suppliers of onboard systems. Few contracts state quantities in the scope text, so an award where the split can be read is unusually useful for inferring industrial structure.
FAQ
What data is this?
Is the amount final?
Is "renew" the same as maintenance?
Why are there more renewals than new builds?
Sources (primary)
This article is an independent organization based on the U.S. official spending data below. Verify the exact, latest details with the official source.
- USAspending (award details)
- Contract ID (PIID):W58RGZ13C0002