≈$18.13B Defense-wide DEFINITIVE CONTRACT N0001914C0067

U.S. Navy: ~$18.1B for long-lead material for the P-8A Poseidon maritime patrol aircraft — a contract with Boeing (USAspending)

Defense Contract Management Agency 2014-08-14 〜 2027-11-30

The U.S. Navy awarded a contract for long-lead material toward production (FRP II) of the P-8A Poseidon (based on the Boeing 737), which performs anti-submarine and patrol missions, to Boeing. The value is about $18.1 billion ($18,129,749,822) — a major program replacing the aging P-3 patrol aircraft.

Contract key facts

  • RecipientTHE BOEING COMPANY
  • Contract value$18,129,749,822 (≈$18.13B)
  • BranchDefense-wide
  • Awarding agencyDepartment of Defense
  • Awarding sub-agencyDefense Contract Management Agency
  • Award typeDEFINITIVE CONTRACT
  • Period of performance2014-08-14 〜 2027-11-30
  • Contract ID (PIID)N0001914C0067

Contract scope (original)

USN P-8A FRP II LONG LEAD MATERIAL

Key points

  • U.S. Navy ordered long-lead material toward P-8A production (FRP II)
  • Awarded to Boeing (the P-8A is a multi-mission maritime aircraft based on the Boeing 737)
  • Value ~$18.1B ($18,129,749,822), definitive contract, Aug 2014–Nov 2027 (multi-year cumulative)
  • Replacing the aging P-3 Orion patrol aircraft
  • Continued investment in maritime-surveillance capability (ASW, patrol, reconnaissance)

This contract funds long-lead material for the second Full-Rate Production (FRP II) lot of the P-8A patrol aircraft, administered via DCMA.

The P-8A "Poseidon" is a multi-mission maritime aircraft developed from the Boeing 737 airliner, performing anti-submarine warfare (ASW), anti-surface warfare, patrol, and reconnaissance. It is being fielded to replace the Navy's long-serving P-3 "Orion" patrol aircraft. Aircraft have long procurement lead times, so it is standard to fund long-lead material ahead of a production lot, and this award is part of that framework.

This contract is a large example of Navy aircraft procurement, showing continued investment in maritime-surveillance capability for ASW and patrol.

Why it matters

A read on Navy aircraft procurement and investment in maritime-surveillance capability for ASW and patrol. Useful for aviation and defense supply chains and for readers tracking Indo-Pacific security trends.

FAQ

What data is this?
A single Department of Defense (DoD) federal procurement contract recorded in "USAspending," the U.S. open government-spending dataset. The recipient, awarding component, value, and scope are public. This site is not an official U.S. government website.
Is the amount final?
It is a cumulative figure as of collection. Large defense contracts accumulate modifications over many years, so amounts change. The latest figure is available at the source, USAspending.
What is the P-8A Poseidon?
A U.S. Navy multi-mission maritime aircraft developed from the Boeing 737, performing anti-submarine warfare, patrol, and reconnaissance. It is the successor to the P-3 Orion.

Sources (primary)

This article is an independent organization based on the U.S. official spending data below. Verify the exact, latest details with the official source.

#Defense#Department of Defense#Navy#Patrol aircraft#P-8A#Federal procurement
Disclaimer: This site independently summarizes and classifies information based on official data sources. Always verify the latest and accurate information with the official sources. Content on finance, health, legal, and security is information, not advice. This site is not an official website of the U.S. government.