Securing long lead material before the production contract — $5.5 billion toward P-8A full rate production
A naval aviation procurement with an obligated value to Boeing of about $5.544 billion. The description reads P-8A FRP LOT I LONG LEAD MATERIAL, covering long lead material for the first full rate production lot of the P-8A. It secures items with long delivery times ahead of the production contract itself.
Contract key facts
- RecipientBoeing
- Contract value$5,544,117,634 (≈$5.54B)
- BranchDefense-wide
- Awarding agencyDepartment of Defense
- Awarding sub-agencyDefense Contract Management Agency
- Award typeDEFINITIVE CONTRACT
- Period of performance2012-08-31 〜 2022-01-07
- Contract ID (PIID)N0001912C0112
Contract scope (original)
P-8A FRP LOT I LONG LEAD MATERIAL
Key points
- Obligated value is about $5.544 billion; the recipient is The Boeing Company and the awarding component is the Defense Contract Management Agency.
- The description reads P-8A FRP LOT I LONG LEAD MATERIAL, covering long lead material for the first full rate production lot.
- Long lead material is secured ahead of the airframe production contract because ordering later would delay the start of production.
- The period runs August 2012 to October 2031, about 19.1 years, nearly double the 10.7-year median across the 207 records this site holds as of 2026-09-02.
- Total outlays on the record are about $5.75 million, a ratio short of 0.1 percent of obligation.
1Securing the parts before building
Aircraft production involves items that take years between order and delivery: specialized forgings, large structural members, electronic components only a few suppliers can make. If such long lead material is ordered only once the airframe production contract is settled, the start of production itself slips. This contract exists to secure that material in advance, as the phrase long lead material in the description indicates.
2Stages of procurement
- 1Securing long lead materialOrdering items with long delivery times ahead of the production contract itself
- 2Low rate initial productionProducing small quantities before the design fully settles, refining through use
- 3Full rate productionMoving to volume production once the design is stable
- 4Sustainment and upgradeMaintenance, spares and capability improvement after fielding
FRP in the description stands for full rate production, showing the program has entered volume production. This contract secures long lead material toward the first lot of that production. Because defense procurement moves through such stages, several contracts on the same aircraft type exist in parallel.
3Nineteen years
The period runs from August 2012 to October 2031, about 19.1 years. The median duration across the 207 defense contracts this site holds as of 2026-09-02 is 10.7 years, so this is nearly double. A contract with the seemingly narrow purpose of securing material running close to twenty years reads as reflecting production continuing across multiple lots, each requiring material to be arranged.
Total outlays on the record are about $5.75 million, a ratio short of 0.1 percent of obligation.
4A record that retains information
Among the defense contract records this site covers, description fields are frequently internal code strings or empty. This one is a chain of abbreviations, yet packs four handles into a short string: aircraft type, production stage, lot, and the nature of the procurement. Record quality varies contract by contract, and how much can be read differs greatly even within the same data stream.
Why it matters
Defense procurement moves through advance material, low rate production, full rate production and sustainment, with several contracts on one aircraft type running in parallel. From the supply chain side, material orders move before the main contract does.
FAQ
What data is this?
What is long lead material?
Is the amount final?
Sources (primary)
This article is an independent organization based on the U.S. official spending data below. Verify the exact, latest details with the official source.
- USAspending (award details)
- Contract ID (PIID):N0001912C0112