≈$3.49B Air Force DEFINITIVE CONTRACT FA881018C0006

About $3.47B to study the polar space vehicles of Next Generation OPIR — the geosynchronous side went to a different company, on the neighbouring contract number (Northrop Grumman, Air Force)

Department of the Air Force 2018-06-25 〜 2031-04-11

A contract to study space vehicles 1 and 2 in the polar orbit portion of Next Generation Overhead Persistent Infrared. The records this site holds contain the geosynchronous portion of the same program as an award to a different company, on the contract number immediately before this one. Together they come to about $10.94 billion.

Contract key facts

  • RecipientNorthrop Grumman
  • Contract value$3,485,513,539 (≈$3.49B)
  • BranchAir Force
  • Awarding agencyDepartment of Defense
  • Awarding sub-agencyDepartment of the Air Force
  • Award typeDEFINITIVE CONTRACT
  • Period of performance2018-06-25 〜 2031-04-11
  • Contract ID (PIID)FA881018C0006

Contract scope (original)

NEXT GENERATION OVERHEAD PERSISTENT INFRARED POLAR SPACE VEHICLES 1 AND 2 STUDY.

Key points

  • A contract to study space vehicles 1 and 2 in the polar orbit portion of Next Generation Overhead Persistent Infrared, at about $3.47 billion.
  • The records this site holds as of 2026-08-31 contain a separate award to Lockheed Martin for the geosynchronous vehicles 1 to 3, at about $7.47 billion.
  • The contract numbers FA881018C0005 (geosynchronous) and FA881018C0006 (polar) are sequential; together the awards come to about $10.94 billion.
  • A geosynchronous orbit keeps the same region in view continuously while a polar orbit reaches high latitudes, so the orbit difference is a difference in role.
  • The description says study, placing this before manufacture and launch. The period runs from June 2018 to April 2031, close to thirteen years.
  • Next-Generation OPIR runs Lockheed at about $7.47 billion on the geosynchronous side and Northrop at about $3.47 billion on the polar, under sequential numbers.

1Where you watch from changes the satellite

Satellites that detect missile launches are designed differently depending on where they watch from. A geosynchronous orbit turns with the Earth, so the same region can be kept in view continuously. A polar orbit circles north to south, reaching high latitudes including the polar regions. Regions hard to see from geosynchronous orbit are covered by satellites in a different orbit.

This record concerns space vehicles 1 and 2 on the polar side, with the geosynchronous side existing as a separate contract.

2The same program going to different companies

In the records this site holds, the geosynchronous vehicles 1 to 3 were awarded to Lockheed Martin at about $7.47 billion and the polar vehicles 1 to 2 to Northrop Grumman at about $3.47 billion, together about $10.94 billion. The contract numbers, FA881018C0005 and FA881018C0006, are sequential, showing they issued from the same awarding flow.

The start dates are 25 June 2018 for the polar side and 14 August 2018 for the geosynchronous, so the polar side came first. Read alone, one looks like an award to a single company; grouped by number, one program divided by orbit becomes visible.

Geosynchronous (vehicles 1-3)Polar (vehicles 1-2, this award)
RecipientLockheed MartinNorthrop Grumman
Amountabout $7.47 billionabout $3.47 billion
Contract numberFA881018C0005FA881018C0006
Start date14 Aug 201825 Jun 2018

3$3.47 billion for a study

The description ends with the word study. This is not a contract to manufacture and launch spacecraft but the examination that precedes it. The amount is nonetheless about $3.47 billion, among the larger figures across the 207 Department of Defense contracts this site holds as of 2026-08-31. In space systems, the stage of deciding what to build itself carries large cost and time.

That the period is set from 2018 to 2031, close to thirteen years, reads as reflecting that character. What the study concluded is not part of this record.

Why it matters

Large space systems are sometimes awarded as one program divided by orbit or by role. Read one contract at a time, each looks like an independent effort. Grouping by contract number or by the wording of a description brings the scale of the whole program, and how it was spread across companies, into view.

FAQ

How do geosynchronous and polar orbits differ?
A geosynchronous orbit turns with the Earth so the same region stays in view continuously, while a polar orbit circles north to south and reaches high latitudes including the polar regions.
Why two companies?
The record gives no reason. What can be read is that the contract numbers are sequential and that the award is divided by orbit between different companies.
What does the study involve?
The description says only study, with no content written. It sits before manufacture and launch rather than covering them.

Sources (primary)

This article is an independent organization based on the U.S. official spending data below. Verify the exact, latest details with the official source.

#Defense#Department of Defense#Air Force#Satellites#Missile defense
Disclaimer: This site independently summarizes and classifies information based on official data sources. Always verify the latest and accurate information with the official sources. Content on finance, health, legal, and security is information, not advice. This site is not an official website of the U.S. government.