≈$8.82B Defense-wide DEFINITIVE CONTRACT FA861108C2897

Stealth fighter F-22 Raptor sustainment (FASTER): ~$8.82B — a long-term sustainment contract with Lockheed Martin (USAspending)

Defense Contract Management Agency 2008-01-01 〜 2024-08-29

Per USAspending, the sustainment program "FASTER" for the U.S. Air Force stealth fighter "F-22 Raptor" was awarded to Lockheed Martin. The value is about $8.82 billion ($8,821,412,144), a definitive contract running 2008–August 2024. A prime example that equipment is not "buy and done": keeping a fleet flying costs vast sums across its whole life.

Contract key facts

  • RecipientLockheed Martin
  • Contract value$8,821,412,144 (≈$8.82B)
  • BranchDefense-wide
  • Awarding agencyDepartment of Defense
  • Awarding sub-agencyDefense Contract Management Agency
  • Award typeDEFINITIVE CONTRACT
  • Period of performance2008-01-01 〜 2024-08-29
  • Contract ID (PIID)FA861108C2897

Contract scope (original)

FOLLOW-ON AGILE SUSTAINMENT TO THE RAPTOR (FASTER)

Key points

  • The F-22 Raptor sustainment program "FASTER" was awarded to Lockheed Martin. Cumulative ~$8.82B ($8,821,412,144).
  • Definitive contract, performance January 2008 – August 29, 2024.
  • The F-22 is a fifth-generation stealth fighter for U.S. Air Force air superiority (new production ended).
  • Sustainment — the cost of keeping purchased equipment flying — piles up across its whole life, often exceeding acquisition cost.
  • Paired with the in-production F-35, it shows a fighter shifting from acquisition to sustainment over its life.
  • A buying-stage contract ends at delivery; a keeping-stage contract begins in earnest once production has ended.

1The cost of keeping equipment flying

Equipment procurement draws attention to buying new, but in reality the "cost of continuing to use it after purchase (sustainment)" piles up to vast sums across an aircraft's whole life. Parts supply, inspection and repair, upgrades, technical support — without this steady underpinning, even an expensive fighter cannot keep flying.

This contract, "FASTER (Follow-on Agile Sustainment To the Raptor)," is precisely the program to keep the F-22 Raptor flying.

2The F-22 air superiority fighter

The F-22 is a fifth-generation stealth fighter that handles U.S. Air Force air superiority. Its production numbers were limited and new production has already ended, so keeping existing aircraft flying long and at high readiness matters greatly.

If the F-35 covered separately on this site is at the "continuing production" stage, the F-22 is at the "keep maintaining what you have" stage; placing them side by side reveals how a fighter shifts its center of gravity from acquisition to sustainment over its life.

3A sustainment contract spanning 16 years

A cumulative ~$8.82B, running from 2008 to 2024, shows that a sustainment contract — unlike a one-off purchase — requires continuous cost over the long term. The description (USAspending) goes as far as the sustainment program name and does not detail individual work (this site does not fill in what the description omits).

4The stage of buying, and the stage of keeping

Procurement draws attention to the purchase of something new, while what accumulates across an airframe's life is the cost of keeping it in use afterwards. For the same fighter, which stage it is in changes the character of the contract.

A contract in the buying stageA contract in the keeping stage
Scale follows how many are builtScale follows how many years they fly
It ends when delivery endsIt continues as long as the aircraft serves
A new capability is acquiredA capability already held is not allowed to lapse
Production ending marks a closeProduction ending is where it begins in earnest

The F-22 is the fifth-generation stealth fighter carrying the Air Force's air superiority mission; numbers built were limited and new production has ended. Keeping the existing fleet flying at high availability for as long as possible is therefore what matters. Roughly $8.82 billion cumulative from 2008 to 2024 shows sustainment demanding cost continuously over a long span, unlike a single purchase.

Why it matters

Sustainment accounts for a large part of equipment lifecycle cost and often exceeds acquisition. For aircraft like the F-22 whose new production has ended, keeping existing aircraft at high readiness makes sustainment all the more important. Attending to sustainment, not just acquisition, reveals the real shape of defense spending and its lifecycle-cost structure. Useful to readers tracking the defense industry and security.

FAQ

What data is this?
A single Department of Defense (DoD) federal procurement contract recorded in "USAspending," the U.S. open government-spending dataset. The recipient, awarding component, value, and scope are public. This site is not an official U.S. government website.
Is the amount final?
It is a cumulative figure as of collection. Large defense contracts accumulate modifications over many years, so amounts change. The latest figure is available at the source, USAspending.
What is sustainment?
The underpinning that keeps purchased equipment usable — parts supply, inspection, repair, upgrades, technical support. Equipment is not "buy and done"; sustainment costs vast sums across its whole life, often exceeding the acquisition cost.

Sources (primary)

This article is an independent organization based on the U.S. official spending data below. Verify the exact, latest details with the official source.

#Defense#Department of Defense#Air Force#Fighter#F-22#Raptor#Sustainment#Lockheed Martin
Disclaimer: This site independently summarizes and classifies information based on official data sources. Always verify the latest and accurate information with the official sources. Content on finance, health, legal, and security is information, not advice. This site is not an official website of the U.S. government.